Shoring plans and shoring plan changes generally have a fast turnaround.

Please furnish a list of existing available materials to be used in the shoring design and the duration that the shoring will remain in use.  Take special note of existing facilities such as utilities and underdrains in the proximity of the proposed shoring.  Other factors that impact the shoring plan include surcharge loads such as heavy equipment performing the work, spoils, traffic, and adjacent structures.

 


SHORING PLAN CHECKLIST

 

In cases that a glory hole or sloping and benching are to be part of the shoring plan, or are part of the existing site, then that would need to be addressed in the shoring plan as well.

From 1992 to 1995 responsible for the review of all shoring plans submitted to Caltrans in District 1 (Lake, Mendocino, Humboldt, Del Norte, & part of Trinity counties)

 